See the case study below about an aging surge control system at the City of Carlsbad’s Batiquitos Pump Station and how MISCOwater was able to provide a timely solution:
The Batiquitos Pump Station (PS) is located along Highway 5 and operated by the City of Carlsbad. The PS ultimately discharges the flow to the Encina Wastewater Authority WPCF to be treated.